Email Phone Facebook Instagram Twitter First Page Last Page Download Search Youtube Xing Date Time Location Login LinkedIn Profile Logout WhatsApp Info

Ground-breaking ceremony for office and laboratory building #42 Infineon Warstein

On 19th June, the ground-breaking ceremony for the new office and laboratory building #42 on the Warstein campus site was celebrated.

 

We are delighted to celebrate this milestone together with our client STONE 59 LUX S.À.R.L. represented by Garbe Immobilien - Projekte GmbH and other project participants. A new building with a gross floor area of around 12,400 square metres will be constructed for Infineon Technologies AG by 2026. Partial planning permission has already been granted. 

The striking, polygonal new building complements the existing campus in the Belecke district of Warstein. A main corridor connects the new six-storey building with an existing laboratory and office building. In addition to the foyer and showroom on the ground floor, catering facilities on the first two upper floors and flexible office space from the third floor upwards, a surrounding roof garden provides quiet zones for employees. Infineon Technologies AG stands for technical innovation, sustainability and energy generation. All these aspects are emphasised by the façade design of the new building: The timber hybrid construction of the load-bearing structure, the deliberately visible integration of the photovoltaic elements and the technical roof made of photovoltaic modules, which appears to float from a distance. The façade opens to the north, offering views of the natural surroundings of the campus.