
Revitalisation and Extension of the Congress Hall at Leipzig Zoo


Historic character restored with renewed presence
The revitalisation of the Congress Hall Leipzig combines the heritageappropriate restoration of historic halls with the addition of new event spaces. Across two construction phases, an ensemble has emerged that preserves history while enabling new uses. Today, 14 rooms are available for conferences, cultural events, and gastronomy, operated by Leipziger Messe. The Palmensaal complements the offer as a restaurant for the zoo.
Revitalisation and extension involving complex heritage‑conservation planning
20 years of vacancy prior to reactivation
14 event rooms for conferences, culture, and gastronomy
5 halls in the new north wing added as a contemporary reinterpretation
9 halls restored in line with heritage requirements: Art Nouveau, Art Deco, post‑1946 modernism
The Congress Hall was opened in 1900 as the social venue of the zoological garden. For decades, it served as a place for encounter, exchange, and, cultural diversity. After provisional repairs to wartime damage following the Second World War, the building remained in need of renovation and, after a fire in 1989, stood vacant for several years. In 2009, the City of Leipzig, together with Leipzig Zoo and Leipziger Messe, decided on a comprehensive refurbishment. The aim was to reestablish the historic ensemble as a contemporary venue.
The new north wing, added to the Congress Hall, embraces the two historic building volumes like a structural clasp. The listed main building remains entirely intact in its massing and clearly legible. Exposed concrete and glass characterise the façades of the new wing, and through design details and clear visual connections they create a relationship with the existing structure. The new architecture deliberately steps back, framing the historic fabric and enhancing its presence within the urban realm.

The new Telemann Hall forms the connecting element between the historic main volumes in the socalled concert garden. The composition is completed by the Palmensaal. The new façades, featuring superimposed pointed arches, draw on historical motifs and reinterpret them in a clear, contemporary architectural language.
The revitalisation required a sensitive approach to a complex building fabric. Transformed over many decades, the building brought together architectural layers from the era of its foundation onwards. The challenge lay in not smoothing out these historical traces but integrating them architecturally. Restoration decisions were made room by room: which layer should remain visible, which should be reconstructed, and which should be receded?

The additional areas not only expand the spatial offering but also broaden the spectrum of potential uses from conferences to cultural events to gastronomic functions. The Congress Hall today is more than a venue: it is a place of exchange, participation, and encounter. The interplay between historic substance and contemporary architecture creates an environment that is locally rooted and internationally connected.
- Project
- Revitalisation & Extension of the Congress Hall at Zoo
- Location
- Leipzig
- Client
- Zoo Leipzig GmbH
- GFA
- 21.170 m²
- Services
- General planning, architecture, revitalization
- Revitalization
- 2015
- Uses
- Congress centre, gastronomy
- Awards
- Architecture Prize of the City of Leipzig 2015 – Honourable Mention; German Architects Building of the Year 2016






